25401, Martinsburg, West Virginia - September 24, 2019
Cabinet Refacing$80.64 - $107.52 per linear foot for mid-grade laminate Labor for cabinet refacing is included. Cost does include removal and disposal of existing fronts and doors, sanding and smoothing cabinet base, and installing new laminate doors, drawer fronts, and hardware. Typically there is an increased cost for upgrading to natural wood materials, repairing pre-existing damages to cabinets, and adding cabinet accessories or organizers.
Reported by: ProMatcher Research Team |
25404, Martinsburg, West Virginia - September 24, 2019
Cabinet Refacing$80.64 - $107.52 per linear foot for mid-grade laminate This estimated price includes cabinet refacing labor. Cost accounts for removal and disposal of existing fronts and doors, sanding and smoothing cabinet base, and installing new laminate doors, drawer fronts, and hardware. Does not include upgrading to natural wood materials, repairing pre-existing damages to cabinets, and adding cabinet accessories or organizers.
Reported by: ProMatcher Research Team |
25401, Martinsburg, West Virginia - May 15, 2019
Refinish Existing Cabinets$6.94 - $8.96 per square foot Cost estimate includes cabinet refinishing. Price does include detaching cabinets and drawers, removing or covering hardware, removing stain, cleaning and sanding wood, applying primer, stain, and clear coating, and re-installing all pieces. Items excluded: removing paint, using a premium stain, repairing damaged cabinets, or adding cabinet accessories.
Reported by: ProMatcher Research Team |
25404, Martinsburg, West Virginia - May 15, 2019
Refinish Existing Cabinets$6.94 - $8.96 per square foot This estimated quote includes refinishing cabinets. It also includes taking off cabinets and drawers, detaching or covering hardware, removing existing stain, sanding and cleaning wood, applying primer, wood stain, and clear sealant, and putting all cabinets and drawers back in place. Cost excludes scaping off paint, applying a top-grade stain, fixing damaged pieces, or installing new organizational accessories.
Reported by: ProMatcher Research Team |